Because of the tremendous depth being drilled, special equipment was required to aid in the removal of the freshly ground particulate. The blue piece of equipment seen above is an air compressor, its job is to blow 1000 psi of air down the drilled shaft forcing the ground water and crushed rock to the surface.
Friday, December 5, 2008
Geothermal Well Construction Part 3
Because of the tremendous depth being drilled, special equipment was required to aid in the removal of the freshly ground particulate. The blue piece of equipment seen above is an air compressor, its job is to blow 1000 psi of air down the drilled shaft forcing the ground water and crushed rock to the surface.