Thursday, December 11, 2008

Geothermal Well Construction Part 4


Each column well, once drilled gets connected to the building through a series of pipes. These pipes run into a mechanical room which will house the heat exchanger and pumps for the system.


There are seven pipes needed to be tied into the system. Each pipe corresponds to a specific well and are in a closed loop between ground water and the building.

These pipes are then covered, and the sidewalks are restored.





0 comments: